Click
Here To Download Standard Features in
pdf
Additional Information
Pre-Approval Application
Standard
colors for Tile, Cabinets and
Granite
Standard
Roof Shingles
Standard
Carpet Colors
General Items
All building permits and impact fees.
Well and Septic System. 100 foot well and a 900 gallon septic underground tank with 300' drain field.
Site preparation which includes clearing the land and delivery of fill.
Exteriors
Concrete block construction with decorative texture finish on all sides.
Top quality 5 year exterior paint.
Architectural shingles rated for 30 year
Hurricane-resistant engineered wood trusses
Bahia sod up to 8,000 sq. ft.
$500 landscape allowance.
640 sq. ft. concrete allowance.
OSB roof sheathing.
Fascia and soffit.
2 outside faucets.
Door chime.
4-5 Zone Irrigation System.
Interiors
Granite kitchen countertops and back
splash
Volume ceilings per plan.
Knockdown textures on walls and ceilings.
Stain resistant carpeting.
Marble window sills.
Double stainless steel kitchen sink.
Recessed icemaker hook up.
Delta faucets.
Cabinets are raised panel doors..
Ceiling fans in bedrooms.
Bedrooms & Baths
Jetted Jacuzzi Tubs in most Models
Granite Bathroom countertops
Bi-fold closet doors.
Linen closet per plan.
Tiled bath and shower units.
Tile floors in foyer, baths, nook, kitchen, and laundry room.
Wall mount bath accessories
Vanity mirrors
Energy Smart Features
13 seer rated A/C system.
R-30 ceiling insulation.
R-10 block and wall insulation.
Insulated and weather striped exterior doors.
Water conserving toilets, faucets, and shower heads.
Energy efficient roof vent and soffit for attic ventilation .
Exhaust fans in all baths.
Ground fault receptacles in baths, kitchen, and garage.
Insulated attic duct work.
Electronic smoke detectors.
2 exterior weather proof outlets.
Vapor barrier under all concrete floors.
220 volt dryer outlet/vented outside.
Pre-wire for 2 phones and 2 cable outlets.
Whirlpool Contractor Grade dishwasher, range/stove, and self vented microwave.
Our
New Home Warranty is one year
workmanship, two year systems, and ten
year structural.
|